A rail grinder heads west through MacGregor.
Fire and Ice. The Loram RG 309 works it's way down the CN Rainy Subdivision on a cold and frosty morning doing what it does best, grinding rail.
Railgrinder staged in W. Shed track.
RG 309 pulls up the main at Elder after clearing for 101, 222 and 40B.
The rail grinder is doing the main track at Marathon, CP 103 is going to meet so the grinding came to a halt
Sparks shower the mainline as this rail grinder works near Duluth on the former DW&P.
Side view of RG 309 with a Canadian and US flag logo.
A Loram rail grinding train on the CN Yazoo Sub.