One of a handful of F59s that have been reactivated to assist the ailing F125 and MP36 fleets shove on the rear of train 661 as they depart Fullerton bound for Los Angeles.
Return to Service. Two and a half years after it was put into storage, Metrolink F59PHR 873 is back in service powering trains around Southern California. The last of Metrolink's original F... (more)
Open During ConstructionMetrolink, southern California’s commuter rail operation, began operating on October 26, 1992. It didn’t take long for this operation to expand, and on ... (more)
An F59, F40 and 4-8-4 walk into a bar... Metrollink lined up the "old equipment" to display with their brand new F125. Wonder if the F59 and/or F40 will live on like the Northern.
SCAX 873 at MP 165 - Metrolink Train 687 in route to Los Angeles Union Station from Oceanside, pushes away from the passenger platform at Fullerton California on the Friday before 2015 Full... (more)
Metrolink Christmas Train on opening night. Program was cut back this year, but free hot dogs and drinks made up for it.
A Metrolink train to Moorpark heads under the Lemona Avenue pedestrian bridge. The lead unit is one of Metrolink's original F59PHs, but it has been rebuilt recently by Motive Power Industries in B... (more)
A Metrolink to Rivrside passes the massive Dynamics Logistics warehouse on the East Bank Line of the River Subdivsion, while a Union Pacific intermodal follows it. Although Metrolink owns these t... (more)
The Orange County Wheelman's Society Chartered Special is seen laying over in San Diego waiting for the club of about 250 people to arrive and Board. Coaster 648 has just arrived on track 1.
SAN BERNADINO SANTA FE TRAIN STORAGE YARDS