The caboose on CP's G41 job passes by the power for G45. G45 was held at this Galewood signal so that the higher priority G41 could pass it, clearing the way for a Metra scoot running on the same ... (more)
A CP crew with locos 3018 and 4409 (in Soo paint) push a centerload flat with bundled lumber on a CP siding in Sparta, Wis. on this overcast afternoon. One crewman watches from the loco doorway, a... (more)