A quartet of late model GP60s and a lone GP40-2 pull SP's hot Denver to Roseville Forwarder through Riverton on Sept. 29, 1993.
SP GP60 leads a West Colton bound manifest.
An EMD GP60 leads a westbound manifest down the original Donner alignment through Applegate.
A solid GP60 quartet heads up the daily Denver to Oakland freight over DRGW rails on June 23, 1994. The consist includes SP 9768, SSW 9651, DRGW 3155, and DRGW 3154.
A westbound vehicle train rips around the giant curve at Long Ravine, its autoracks visible in the distance through a notch in the Sierra forest.
Facing into a setting sun, SP 9768 holds on No. 2 track a couple miles shy of Roseville Yard waiting for trains ahead to clear.
SP 9768 West comes down the original Central Pacific alignment at Newcastle and heads for the now double-track tunnel.