In honor of Canada's birthday on July 1st, I decided to show a little patriotism at work. During our lunch I set the scene, and with the help of a remote I captured myself proudly displaying our n... (more)
The Annacis barge job pulls the last track off the bow of the Carrier Princess as they complete their unload. The head end of the train is long behind the tree line as it was a full load of rail c... (more)
SRY’s southbound Duncan Turn waits in the siding at Chemainus for northbound VIA 199 to arrive. SRY 119 entered service in 1957 as Northern Pacific 340 then became Burlington Northern 1925 in 1... (more)
SRY 119 and 110 prepare to deliver their three grain cars to Top Shelf Feeds in Duncan.
SRY 119 and 110, in Rail Link's new paint scheme, make a light engine move to the shop track at Wellcox Yard.
One month after the SRY take over of operations on Vancouver Island SRY 119 and 110 share the engine terminal with ENR 3870 and 3809