A Southbound IMRL train is working towards Plymouth and onto the Iowa Northern at there. IMRL used the IANR alot in those days to get around the runaround at Mason City needed to run east with tra... (more)
SRY 382 lifts the siding at Sperling in the snow.
SRY 382 leads the Valley Turn down Kennedy Hill in the snow.
SRY 382 Brings The Valley Job West After Working Langley.
Traveling at an amazing 8.4 MPH today's hogger gets ready for some switching on our way back to New West. **Photo taken with permission**
SRY 382 gets ready to head West again after switching Hardwoods on the Fraser Valley Sub.
On lease to the I & M Rail Link
Pulling into New Westminster yard, led by a SD38-2 and followed by a SD38AC. 382 was built 12/1972 and 381 in 10/1971 for British Columbia Hydro. (pre SRY)