Dave Buben guides the 1200 through plant trackage while the 1202 waits for a helper assignment on the mid day log train to Mill 5.
At MP 4.5 the railroad abuts Carman Road for ΒΌ mile. On the end of the log train two switchers pushing roar past and disappear into the woods on the trip up to Mill 5, five miles away.