The log trains run by the tide schedule, which affects when they can load wood out of the bay. So when the the railroad makes a run up the hill later in the afternoon you will see them tack on th... (more)
It was a slow day for the crew and the stable was full early in the afternoon. The 1202 is the first engine, then the 1201. Just in from the rain is the 1200, and the 900 occupies the stall next... (more)
The 1202 is on the end of a log train moving through the back yards of downtown Shelton at the beginning of a trip uphill to Dayton. The bridge is the new one which, in February 2010, replaced th... (more)