The Grand Island switcher heads west for Central States Component Systems with a single car of lumber.
UP 2179 & 1485 head west to work Diamond Plastics.
LTS82B approaches Cardinal Glass in Menomonie with a single SD62E for power.
An SD60 standard cab brings up the rear of ILBLBL as their power heads back to Dolores to pick up a train.
Union Pacific ILBLB (known affectionately by the crews as the One Pounder) heads around the wye in order to change directions before breaking up an inbound train to ICTF.
Union Pacific ILBLB (known affectionately by the crews as the One Pounder) heads down to the wye on Pacific Harbor Line's Wilmington Sub in order to change directions before breaking up an inbound... (more)
A rebuilt SD60 awaits its next assignment with a rebuilt SD40-2 by the ICTF Support Yard.
Power for an extra LOG44 has just set out a stack train in the 300 tracks at the west end of the ICTF Support Yard and head to the 900 tracks on the east end to pick up more cars to take to East L... (more)
Power from the Union Pacific "Anaheim Hauler" lays over on the wye in Anaheim before heading back to West Colton Yard. Facing the camera is UP SD60 2179, built in April 1986 as UP 6024.... (more)
Relegated to yard and transfer service, a pair of SD60s switch Albina Yard before heading out with the Lake Transfer.
UP 2179 waits on a siding next to the Rio hotel in Las Vegas for an east bound double stack to pass
UP 2179 a east bound freight waits for a Eastbounds stack to pass