In the early 1960s, The Rio Grande hired Morrison-Knudsen to build a branchline from Brendel, Utah to a potash mine South of Moab. The 35.77-mile line was completed in 1963. The scenery on the lin... (more)
Every trip has a "must-have" shot. A scene that one looks at for a long time before they travel to a new location. Moab, Utah had been a place my wife and I have long wanted to visit wit... (more)
UP 4858 departs Grand Island with an eastbound manifest.
NS 204 races under the classic Southern Railway signal bridge in Lowell with a visitor from Uncle Pete in the lead.
UP 4858 climbs the grade between Sloat and Two Rivers in the upper regions of the Feather River Canyon.