UP 5477 & 9033 race east with stacks.
First light and (at the time) a newer UP locomotive grinds uphill at Troy, CA in the typical winterwonderland on Donner Pass.
UP 5477 leads CP train 568 north through Niobe.
Empty grain heads south before taking the Graham line east and back Canada.
A southbound Union Pacific potash train traverses the Snake River at Lyons Ferry, WA during the last few minutes of waning sunlight of a hot summer day
UP 5477 and 7053 idles with this string of coal cars at the Intermountain Power Project yard in Springville.
The final rays of the sun reflect off the scotchlight on the nose of GEVO 5477 as the westbound stack train waits for the eastbound Texas Eagle to get closer before it proceeds into the siding and... (more)
The cold temperatures have helped preserve the snow on the trees nearly two days after the storm. Another rough hike!