UP 5866 & 8764 westbound with a stack train.
An eastbound UP intermodal symbol passes beneath the old El Paso & Southwestern bridge as it roars uphill on Two Track.
UP northbound empty coal approaching Greenland on exRio Grande main with Pikes Peak in the distance
A freshly painted GP60 leads Union Pacific's MDVRO through Castle Gate on March 21, 1999. The UP 5866 was built by EMD as the SP 9767 in July 1991, and the UP 9078 (also in fresh paint) was built ... (more)
UP #5866 awaits a clear signal to proceed into Paducah Kentucky.
Following the reefer Z out of town is the UP 5866 on the point of a "no-grainer" (empty grain train). The train is picking up speed as it begins the long race through northern Nevada.
NS 712 Coal Drag Tackles Dugdown Mountain NW Georgia Test Train With CEFX Hoppers
UP 5866 leads eastern coal drag NS 712 up Dugdown Mtn.