In a mountain valley mostly cloaked in cloud shadows, an eastbound Union Pacific coal load heads downgrade through Tolland, Colorado, on the morning of September 23, 1999.
An eastbound Union Pacific coal train drops downgrade into Rocky, Colorado, while heading east on the former Rio Grande Moffat Tunnel route on April 13, 2002.
A northbound loaded Illinois coal train crosses the bridge over a swollen Fountain Creek.
Encircling the mouth of Coal Creek Canyon east of Plainview, Colorado, on January 8, 2003, is a westbound Union Pacific coal empty with eight locomotives up front. Seven GE AC4400CW varieties from... (more)
UP 6552 has left the North Yard and is about ready to pass through Fox Junction on its way to the Joint Line and Colorado Springs
UP 6552 (AC4400CW) leads a freight out of the UP's North Yard in Denver and passes through Fox Junction on its way to Colorado Springs via the Joint Line.
A loaded UP coal train passes through Reno Junction as a UP train loads in the background with SP units as DPU’s.
108 coal loads from Carbon County curve west through the Jordan River Narrows approaching East Riverton.
CSX R667 comes out of the siding at Gloster to take the main south to Atlanta.