On a cold and windy morning along the Western Slope of the Rocky Mountains, Union Pacific 6559 drags a westbound coal train through the red mountains near Burns, Colorado. Burns was named after th... (more)
Completed in 1934, the Dotsero Cutoff was built by the Denver & Rio Grande Western Railroad in order to shorten the journey between Denver and Salt Lake City. Previously, westbound trains at Denve... (more)
A really clean AC4400CW leads a manifest train southbound on the Chester Sub at Fults, Illinois.
Eastbound coal loads waits for westbound empties at Pinecliffe
A trio of UP AC's lead a westbound coal load west out of Provo onto the Sharp Subdivision main to Lynndyl, Utah.
Not much snow in the canyon on this February day as big UP power hauls a loaded ITTX coal train upgrade towards Soldier Summit.
After an assist to the summit, this coal train drops downgrade towards Provo.
Westbound UP 6559 leading an autorack manifest through downtown O'Fallon.
First snow of the season