Union Pacific GE AC4400CW No. 6704 has its old prime mover and generator carefully lifted out of locomotive at UP’s South Morrill Locomotive Facility on September 14, 2017. During this overhaul,... (more)
Union Pacific GE AC4400CW No. 6704 is at the railroad’s South Morrill Locomotive Facility for an overhaul, with the new prime mover arriving from the staging area in the shop on September 14, 20... (more)
Union Pacific GE AC4400CW No. 6704 gets a scrubbing by Kaleb Ewing and Martin Hernandez following the locomotive’s overhaul at UP’s South Morrill Locomotive Facility in Nebraska on September 1... (more)
The old prime mover and generator are carefully lifted out of Union Pacific GE AC4400CW No. 6704 at the railroad’s South Morrill Locomotive Facility on September 14, 2017. During this overhaul, ... (more)
On September 14, 2017, Union Pacific GE AC4400CW No. 6704 is at the railroad’s South Morrill Locomotive Facility for an overhaul, with an overhead crane being used to remove the old prime mover ... (more)