After a locomotive mechanical issue was resolved, UP 7365 charges a long stack train around the loops at Caliente up grade on towards Tehachapi.
As a BNSF Geomtry train descends downgrade in the background, UP 7365 is stopped with engine issues at Caliente.
UP 7365 (AC45CCTE) gets ready to pass the local freight as it heads towards Greeley, Colorado.
In the clouds, eastbound stacks crest the highest point on the Transcontinental Railroad.
On a miserably hot late July day, a long Englewood Yard (Houston), TX to El Paso, TX manifest train scoots down Union Pacific's Del Rio Subdivision through the downtown San Antonio area with a gen... (more)
I G2LB-21 With UP 7365 on the point and UP 7663 as the rear DPU with 21 Loads, 1362 Tons 1916 Feet. 1X1 harah, harah! This is UP 7365 maiden trip West. Photographed at 08:34.
I G2LB-21 With UP 7365 on the point and UP 7663 as the rear DPU with 21 Loads, 1362 Tons 1916 Feet. 1X1 harah, harah! This is UP 7365 maiden trip West. Photographed at 08:45.