Precision Scheduled Railroading? What appears to be a tie train is anything but. After the ties there is a string of stacks followed by long string of auto racks broke up by an individual ... (more)
An intermodal from Englewood heads through Cabezon as the last light of the day makes it glow. This was the fourth time we caught this train that day, having shot it hundreds of miles east at Dome... (more)
An intermodal from Englewood heads through Fingal in Whitewater on its way to Long Beach. This was the second time we caught this train that day, having shot it hundreds of miles east at Dome Vall... (more)
An intermodal from Englewood heads through Fingal in Winterhaven on its way to Long Beach. This was the second time we caught this train that day, having shot it hundreds of miles east at Dome Val... (more)
UP 8158 leads a patched SP AC on this eastbound stacker.
Union Pacific's Intermountain Power to Skyline coal empty has crested 7440 ft. Soldier Summit and now glides east toward the Pleasant Valley Sub connection at Colton. July 26, 2014