In the late afternoon Union's 76 crew battles heavy shadows as it works up hill towards the Dravosburg tunnel and US Steels Irvin Works with a loaded slab train from ET.
76 crew, the slab train shoves up the low grade to head for USS Irvin works. In the background the massive Westinghouse Bridge crosses the valley 240' above the valley floor.