Vermont Rail System, for only the second time in a year (and by design) operated an all-red consist that is book-ended by the railproad’s pair of SD70M-2s. Due to bridge restrictions and weight ... (more)
This is a shot that was planned out since December and we finally were able to pull off just days before significant rain and warming temps threaten to ruin the chance to complete. Merry Christma... (more)
Vermont Rail System, for only the second time in a year (and by design) operated an all-red consist that is book-ended by the railproad’s pair of SD70M-2s. Due to bridge restrictions and weight... (more)
Vermont Rail System, for only the second time in a year (and by design) operated an all-red consist that is book-ended by the railroad’s pair of SD70M-2s. Due to bridge restrictions and weight ... (more)
During the first day of this consist being run for a variety of PR and marketing photos, the sun was shining in this location and was more nose on lighting due to the time of the day. The second ... (more)
With the B & R Subdivision, between Rutland and Bennington, Vermont, being curfewed for bridgework, the opportunity arose to do some marketing and PR photos with both of the six axle Vermont Railw... (more)