WSOR 4077 and GDLK 4002 lead train 302 south through Kalamazoo and is crossing the Amtrak Michigan line just around the corner. 302 is bound for the NS at Elkhart IN. The Grand Elk is very power s... (more)
WSOR works the Cottage Grove industries. The track on the right is the former CNW Madison-Waukesha main, which turns into a bike path about 2000' down the track.