The Pennsy Heritage units clearing Sinking Springs before sunrise.
An NS 25A train eases slowly across the Cincinnati Southern Bridge as it begins its southward journey on the CNO&TP.
A stack train makes its way south through trees that in a little while will be loaded with greenery.
A local with an ex-Conrail locomotive in the lead switches the yard as 25A arrives at the intermodal terminal.
Near sunset, NS symbol 25A arrives at Gest Street Yard for a crew change and added loads.
NS intermodal symbol 25A arrives at Gest Street.
NS 2522 South passes Ludlow Yard just before sunset.
NS train No. 25A approaches the south bank of the Ohio River.
NS 25A eastbound with new BNSF power grinds the hill on the NS ex NKP Chicago line at MP 417.