The "B" train is just out of Janesville, dropping into the Turtle Creek valley headed back to Proviso. There are no restrictions on that load tucked in behind the power.
The "B" train waits to enter the yard.
The B train makes it's afternoon appearance at Turtle Creek...
UP sends the "B" train up to Janesville with auto parts, here the train passes an old elevator in Clinton.
The flag unit leads the B train on the bridge over bubbling Turtle Creek. In 2002 #9448 was perhaps the only unit in this class of GE's that got the flag. If you want to see all five arches of t... (more)
UP's "B" train crosses the bridge over Turtle Creek. This 387.5' bridge was built in 1869 by hand labor. Excepting some concrete & steel rod upgrades in 1930 it remains basically unaltered.
UP's "B" train for GM's Janesville WI. plant arrives from Proviso. The "A" train arrives early AM, the "B" train can be counted on late afternoon. Power is former CNW cab-signalled units. Infa... (more)