CP 101's train is a few miles west of Marathon
With the mercury dipping to -22c/-8F at the peak of the day, it is still business as usual for Canadian Pacific with their flagship Toronto to Vancouver #101; heading through Heron Bay East.
Running on-time status, CP's flag ship #101 departs Thunder Bay passing a pair of unassigned ECO's. The grain elevator in the background (Saskatchewan Wheat Pool 8) is slated to be demolished.
CP 101 pulls down the North track as CP 100 departs on the South at Port Arthur
After a quick crew change, CP's flagship Toronto, ON - Vancouver, BC #101 departs on time westward.
CP 101 heads through Coldwell with a large chunck of autos for Ogden, AB and Vancouver, BC upfront. Inlcuding 3 Hino's, and 3 E450 National Unicell trucks.