5755,5576,9015,5787 have no trouble hauling these 50 cars at 60mph through the Valley
Train 429 with a brace of 4 SD40-2s, approaches the grade crossing in the middle of Lovekin siding (Belleville sub)
Train 429 with a brace of 4 SD40-2s, taking the siding for a meet at Lovekin (Belleville subdivision)