2RMS-16 passes by on its way up the new main
2RMS-16 rolls up the new grade at Lake Louise
Railgrinder staged in W. Shed track.
SRS 138 idles next to CP 8541 & MPEX 601.
Slowing grinding eastwards on the single main Belleville Sub.
RG 309 pulls up the main at Elder after clearing for 101, 222 and 40B.
The rail grinder is doing the main track at Marathon, CP 103 is going to meet so the grinding came to a halt
light move at trackspeed
@ work grinding the switch and the crossing, note the sparks underneath
Two crew members are on the otherside doing some cleaning
Not to many trains are able to maintain track speed up Neys Hill
This is bound for Toronto Agincourt for ballest removal
At MP 94, CP crosses over the Steel River, then through a tall rock cut and followed by the Steel Tunnel. CP #RMS-DC 1, conveyor, caboose-12 axles @ 12:00
This machine digs ballest from the right of way to make ditches. They are running light from Winnipeg to Toronto.