3097 with bent plow and all is part of a three unit Galt Yard job. Two is normal
Two Alstom rebuilds (8222 and GP38-2 3043) bracket GP38-2 3057 as the Galt Yard Job goes to work
Sunrise at Galt Yard
Power for the Galt yard job relaxes in sun outside the Galt Station. They didn't last long on the job as they turned a rail retuning from the Toyota plant. It's back to GP38's
A rather grubby pair of GP38-2's shove their train west before heading for the Toyota plant
Basking in the sun after a long day