After meeting trackage rights train NS 334, CSX K621 gets a signal from the soon to fall L&N searchlight onto the single track at James. Once the rear end clears the next curve to the south/west (... (more)
The CSX crew has just handed off their loaded fly ash train to an engineer for the Sequatchie Valley Railroad, who will take the train north out of Bridgeport to a company in the drywall industry.... (more)
Having traversed Raccoon Mountain, loaded fly ash train K621 is now flying southwest (railroad north) along Nickajack Lake. The sun popped out from behind summer cloudcover at the perfect moment t... (more)
CSX K621-21 (Stilesboro,GA-Bridgeport,AL) come pass the OWA 132.0 mile post on its way north loaded with 67 hopper loaded with gypsum from the Stilesboro powerplant. Once the train get to Wauhatch... (more)
K621 comes across the Tennessee River with hoppers to be interchanged to SQVR. The river crossing here is split by Long Island and the lift span over the main channel is at far left.