Northbound Q542 passes through Marietta lead by a pair of leased CitiRail Gevos
Northbound Q542 catches the last light of the day as it crosses the Etowah River
CEFX & HLCX SD40-2's brings CSX Q542 through the crossovers at 'Tilford' beginning its trip to Etowah, TN.
CEFX and HLCX SD40-2's bring CSX Q542 by the West Lake MARTA Station
Illinois Central SD70 #1019 leads CSX Q542 through downtown passing the adjacent NS signals at 'Grinnell'.
Q542 heads north by the Appalachian Regional Port with the 4535, one the first two engines to get the newly rebirthed YN3 paint scheme, on the point.
After working Wyvern Yard, Q542 accelerates north for Etowah, passing the milepost marker to mark 415 miles to Louisville, KY shortly after midnight.
Q542 takes it easy going through town as it gets ready to work North Yard.
CSX Q542 climbs the hills just outside of Waycross, GA on their way north to Cinncinati, OH. The clean YN2 CW44AC fourth in the consist has been repainted into YN3b since this photo was taken.
CSX Q542 (Waycross, GA to Cinncinati, OH) doubles out of Rice Yard in preparation for departure.
During the only decent snow of the winter, Q542 speeds past the NAS Searchlight signals at South End Singleton.
CSX Q542 passes by the calm pond at the Ryland Lakes Country Club as it heads towards the Queen City
CSX SD40-2 #8052 leads Q542 across the Etowah River on a gorgeous Wednesday afternoon.
Northbound manifest Q542 has just passed Sinks and the former Lebanon Branch connection and is about to enter Tunnel 18 on the scenic CC Subdivision.
Q542 pops out of tunnel 8 and rumbles onto bridge 36, beginning the climb out of the Kentucky River valley.