Union Pacific's Wattis Plateau to Intermountain Power coal load grinds its way west on the 1% climb to 5033 ft. York Summit. Summit Creek Number 2 Reservoir (at right) is privately owned and utili... (more)
On a warm July 10, 1993 morning, 84 loads of Star Point coal depart the Wattis Plateau loader for Intermountain Power.
On a gorgeous July morning in 1993, an 84 car Intermountain Power coal empty is loading at the Wattis Plateau flood loader near Hiawatha. The facility was designed to ship 200,000 tons of coal ann... (more)