With four tunnel motors, an SD45 and an SD50 for power, Rio Grande's ballast train 648 grinds eastward through the Salt Lake Valley with a lengthy train of smelter slag from the Midvale pit.
Rio Grande ballast train 648 takes the shorter but steeper westward main track up the Mapleton Bench on June 6, 1988.