A pair of back to back EMD DD35s roll east through Utah's Tintic Valley approaching Boulter on Oct. 2, 1977. UP 79 and 70 were built new for the UP by EMD in 1965. When everything was working as d... (more)
A Rio Grande home built caboose trails an eastbound manifest through Soldier Summit on July 14, 1979. An open autorack loaded with new 1979 Chevy Monte Carlos take a tour of the scenic D&RGW.
A Union Pacific eastbound freight works to conquer the 1.18% grade of the old Provo Subdivision mainline near Point of the Mountain. This secondary mainline lost its status as a through route when... (more)
Rio Grande 3116 East ramps it up at Gomex for the 37 mile climb to Soldier Summit. At the time, we didn't know that within a week, the mainline through Thistle would be closed forever due to a mas... (more)