Highspeed tilting train ETR 610 # 007 of the SBB running as Eurocity 19 from Zürich to Milan in the Wattinger curve near Wassen.
ETR 610 # 005 of the SBB is entering the 57 kilometer long Gotthard Base Tunnel (GBT) at Rynächt near Erstfeld shortly. It is running from Zürich to Milan as Eurocity 19.
Highspeed tilting train ETR 610 # 005 of the SBB is running the Eurocity 19 from Zürich to Milan on the Ceneri line between Rivera-Bironico and Taverne-Torricella. Only seconds after the train pa... (more)
Highspeed tilting train ETR 610 # 009, together with a second train of the same series in multiple, is running the Eurocity 19 from Zürich to Milan with 200 km/h over the Biasca bypass of the GBT... (more)
Two coupled highspeed tilting trains of the ETR 610 series of the SBB are running as Eurocity 19 from Zürich to Milan over the Gotthard Base Tunnel line near Biasca.
Highspeed tilting train ETR 610 # 0.. of the SBB is running as Eurocity 19 Zürich-Milan through the short Muhren tunnel on the Gotthard north ramp.
Highspeed tilting train ETR 610 # 007 as Eurocity 19 from Zürich to Milan in the Wattinger curve near Wassen.
In less then one second, the long nose of the highspeed tilting train ETR 610 will disappear in the 15 kilometer long Gotthard tunnel. Eurocity 19 is running from Zürich to Milan.
ETR 610 as Eurocity 19 from Zürich to Milan between Pfaffensprung loop and Muhren tunnel near Gurtnellen.
ETR 470 001, owned by Trenitalia, with some graffiti on the first car on the way to Milan (Italy).