Eastbound L31
Eastbound L31 all stopped about to work 84 Lumber.
Westbound L31 passing an eastbound BNSF freight, and below the drone are 9 new locomotives on the Wabtech interchange track waiting to be picked up by the BNSF.
The train is getting tied down.
Eastbound LL31 returning to Dallas yard from Denton TX after working 84 Lumber
L31 westbound stopped at Ganzer Rd and the crew got in the Limo and went back to Wylie. CPKFC having crew shortages and this train will move again when they get a rested crew to run it.
L31 eastbound tied down on the main
Eastbound Denton Dodger went on the law on the main at Cowley.
The local gets tied down with no rested crew to move the train.
Rounding the wye at Metro junction
Eastbound 31 local merging on the new Silver Line trackage at Control Point Park.
Eastbound 31 local with a friendly wave from both engineer and conductor.
Eastbound 31 local rolling over IH-35E.
Eastbound 31 local rolling on the White Rock sub to Dallas yard. Power will be cut off at Dallas yard and ran to the other end and on to Wylie yard.
Eastbound 31 local returning to Wylie rolling on the White Rock sub.