A C44-9W leads the M-BARRIC, as it rounds the curve into Bealville, while the rear portion of its train can be seen passing through the north end of Cliff.
A Richmond bound manifest rolls downgrade past the south switch at Bealville.
An ES44DC leads the M-BARRIC as it crosses over the Tehachapi Creek at the south end of Rowen.
With the conductor on the front porch of the lead locomotive, this Richmond bound manifest rounds the curve at Warren, as its works up the No. 2 track toward Tehachapi.
The day is almost over for this BNSF crew as the sun sets over Bakersfield, while a UP manifest gets underway in the distance, after a crew change.
An interesting consist, which included a SW1500 as the second unit, works upgrade around the curve at Warren.
A colorful consist leads a westbound through Franklin Canyon.