Montana Rail Link’s Helena switch arrives at Townsend, Montana, passing the searchlight signals at the west end of the siding there on July 5, 2018, Veteran GP9 No. 109 and SD40-2XR No. 262 lead... (more)
Montana Rail Link’s Helena switch descends Winston Hill just east of Winston, Montana, on July 1, 2019. Powering the local with cars for RY Timber and the cement plant in Townsend is MRL GP9 No.... (more)
Montana Rail Link’s Helena switch dashes over Winston Hill just east of Winston into a darkening evening in Montana at 9:15 p.m. on June 25, 2019. Powering the short local with two cars for the ... (more)
Powered by Montana Rail Link GP9 No. 109 and SD40-2 No. 250, MRL’s Helena switch zips over Winston Hill with two cars for the cement plant in Townsend following a BNSF coal train into the darken... (more)
Switching Montana City The crew of Montana Rail Link GP9 No. 109 and SD40-2XR No. 262 make quick work of switching the Ash Grove Cement plant at Montana City, Montana, on the afternoon ... (more)