Following Winter Storm "Nemo", operations on the New England Central Railroad were shut down through Saturday afternoon, when a 'Driftbuster' light engine move was dispatched out of St. Albans, Ve... (more)
The new joint Vermont Rail System and New England Central Railroad "Rock Train" operation that is delivering rock from Burlington to Bethel, VT to aid in rebuilding Route 107 (wiped out in Irene f... (more)