Working south at mile 101 of the Roxbury Subdivision at 5 mph with the LB Foster rail train that is supplying the SDI rail to New England Central Railroad, the FEC GP40-3 437 and GEXR GP38 3843 wi... (more)
Rolling south with 80,500 feet - 50 strands of 1,610' 115-pound continous welded rail - FEC SD40-2 722 passes rail dropped earlier in the week. More than 141 miles will be laid on the former Centr... (more)
Rolling south with 80,500 feet - 50 strands of 1,610' 115-pound continous welded rail - FEC SD40-2 722 passes rail dropped earlier in the week in downtown Milton - mile 119 of the Roxbury Subdivis... (more)
Heading south through Georgia, Vermont, the final continuous welded rail (CWR) train for the 2010 season (80,500 feet on this particular train) is behind FEC SD40-2 722 on a cold November day.
Heading south over the Georgia High Bridge in Georgia, Vermont, the final continuous welded rail (CWR) train for the 2010 season (80,500 feet on this particular train) is behind FEC SD40-2 722 on ... (more)
New England Central Railroad's first rail train to St. Albans was emptied of the nearly 7 miles (one 1,650 strand remained on the train) of 132 RE continuous welded rail and is now on the way back... (more)