UP on NS heading to UP NS 115 hanging the left at North Chicago Junction with a pair of UP GEs as they're making their way to Union Pacific's 18th Street Yard on the other side of the Kan... (more)
NS 115 approaching the north end of Laurel Siding for a meet with NS 54G
After waiting for T76 to clear the single track ahead of them, the crew of 115 have blasted off from Blair, as they roll under the signals.
First train of the day. NS 115 north was the first train that I photographed this particular morning, on my first railfan trip to Clinton. Many thanks to Joe Rose who served as my "tour guide... (more)
After picking up a string of auto racks from the Toyota spur, train 115 pulls towards Princeton and waits for clearance to head west.
Train 115 pulls nearly two miles of loaded auto racks from the Toyota lead up the Douglas siding. Construction under way to add track from Princeton yard to Toyota lead.
NS #115 takes the turn and heads for Centralia.
Eastbound NS train #115 approaches the CN/IC diamond.
Eastbound NS 115 rolls past freshly-mowed fields of green en route to the hole in New Baden.
NS #115 waits on the main as NS #112 takes the siding.
Eastbound NS 115 speeds into New Baden behind the 223...meeting the 168 and 224 westbounds.
Eastbound 115 passes the Negwer Materials spur.
Eastbound NS 115 with an single SD60 on point prepares to cross Lebanon Ave.
A lengthy NS 115 crosses the CN(IC) diamonds in Centralia, IL. The train extends all the way back past the IL-161 overpass.