After a massive derailment at Wyomissing Jct. caused all the thru tracks to be blocked, NS was left with no other option but to run 21M west over NJ... (more)
Westbound NS intermodal 21M races through CP RADE and under the new Safetran signals that are waiting to be activated when the interlocking is cutover. At the cutover, PTC will be active and these... (more)
In a move rarely seen, NS 21M crosses over from track 2 to track 1 at CP-Altoona as it heads westbound up the East Slope of the NS Pittsburgh Line. Due to the derailment of NS 35A at Horseshoe Cur... (more)