National Coal uses three wheel loaders to load a unit train in under six hours. The three engines are idling downgrade beyond the coal silo which has been abandoned.
Crews working on both sides of a derailed loaded coal hopper. The car must be unloaded by hand before being rerailed, not an easy task in blowing snow and cold temps.