Work train is involved in spotting equipment and ties for the installation of the extension to the Washington - Glade Spring siding.
Norfolk Southern workmen assemble a new switch to be installed in conjunction with the on-going grading work to extend the Washington - Glade Spring siding as the track train drops off new rails.
Track train heading east for a meet with 22A at Glade Spring.
NS # 3435 makes his way through Blake, WV on train 94V. He is shown here going through a bit of a snow storm.
Ballast train on the siding to allow 22A to pass.
Rail train is waiting on arrival of 23G.
A pair of High Hoods cross the New River at Narrows VA, as they prepare to take their train another 10 miles where it will tie down for the weekend.
An NS work train crosses the river at Narrows with a pair of high hood EMDs leading two empty flats.