On a day so humid you could cut the air, worktrain 97J ambles toward Toptiki to drop off a clamshell, then spend the rest of the day loading ties. Slidefence is typical of the Pokey.
Backing up to clear the main, 97J and a friendly brakeman prepares to cross the defect detector on the way to Glen Alum. Common to find a caboose on the Pokey most any day.
An ancient GP38AC prepares to leave the small yard on the Lenor Branch to do MOW ditchwork. This won't be the only work on the main as nothing was moving on the mainline for hours.
Work train 97J has the brakeman set the switch as it idles out to the Pokey main to do ditch work, caboose and all. The Pokey was slow the first half of the day with work going on from one end to ... (more)