H52 approaches the east end of Bison Yard as heavy snow falls. Behind the lead C40-8W is a PRLX former CSXT AC6000 and a BPRR GP headed back to the BP from the RSR.
An unusual occurrence, a ES40DC leads H52 back to Buffalo LHF due to the inability of the SD60M to lead.