The J53 running pusher service, prepares to depart Bluefield Yard as the J51 arrives on the end of a mixed freight, and the J54 has cut loose from a unit coal train. (3 sets of ES44AC's)
With dust from tunnel work flying, two new AC motors making a pusher set head west for either a coal or grain drag. Much of the Heartland Corridor project is completed, evident from Roderfield tun... (more)