The Salisbury Switcher sits idle in the Old Yard.
NS Salisbury Job is backing into the box plant to pick up three empties to take back to the old yard, this was my first full day railfanning in atleast a year or longer. Man I missed it.
The PL25 Salisbury Switcher turns on the wye.. again.. The only thing they seemed to do all day was pull around this old N&W caboose.
The engineer of the Salisbury Switcher throttles up, leaving an exhaust plume from his GP38-2's as they had south at Salisbury.
A step back in time with Southern FP7 6133 on the mainline in route back to the NCTM
PL25 sits at the Old Yard.
Salisbury Switcher