An empty coal train heads to the Burr Oak Mine with two Ohio Central Tunnel motors for power.
The empty coal train to load at Burr Oak Mine is now shoving in off the NS mainline into the mine. This job uses power on both ends for the push-pull moves at Zanesville, OH, and here at this mine... (more)
Ohio Central Burr Oak Turn 1 heads south with 54 empties for loading at the Burr Oak Mine south of Corning, OH. Ohio Central uses 3 crews to load/unload and also to move this coal train set betwe... (more)
The empty coal train to load at Burr Oak Mine is now shoving in off the NS line into the plant. This job uses power on both ends for the push-pull moves at Zanesville, OH, and here at this mine. T... (more)
Southbound empty coal train with 54 cars and power on both ends is about to enter the natural tunnel near Rehobeth. This train runs between the power plant at Conesville, OH, and mines located at ... (more)