This snazzy little 3 car inspection train, PDVSC2-26, has stopped at Helper for a crew change. Everything about this train is spotless and looks as if it was just painted yesterday. Ahead is the P... (more)
This 3 car Union Pacific inspection train is swinging through the S curves at the upper end of the 2.4% grade in the Price River Canyon, Utah. The train was expected earlier in the day, but by the... (more)
A Union Pacific inspection special crests 7440 ft. Soldier Summit on the evening of July 26, 2014.
Union Pacific's PDVSC2-26 inspection special glides west through Spanish Fork Canyon approaching the Thistle Tunnels on July 26, 2014.
Union Pacific's PDVSC2-26 inspection special emerges from the Red Narrows of Spanish Fork Canyon approaching Rio on July 26, 2014.
A Union Pacific inspection special emerges from the Kyune Tunnels the evening of July 26, 2014.
A Union Pacific inspection special descends the 2% grade through the lower Gilluly horseshoe curve the evening of July 26, 2014.
Bathed in 'Golden Hour' light, a Union Pacific inspection special emerges from Spanish Fork Canyon on July 26, 2014.
A Union Pacific inspection special heads west along Price River approaching Colton the evening of July 26, 2014.
A Union Pacific inspection special glides west through Price Canyon the evening of July 26, 2014.