YPBN15 slows to a stop at CP-Sepulveda after getting a high load defect on their 10,000ft train. Three Dash 9s are the power including a pair of warbonnets on this recrew of the S-MEMLBT1.
YPBN15 (left) enters CP-Gaspur on its way to Terminal Island from LBCT as YPSW14 (right) switches Pier B Yard as a clear summer afternoon.
A Pacific Harbor Line BNSF Dock Job brings 108 loaded platforms from Pier E in the Port of Long Beach behind a single MPI rebuild bound for Terminal Island to be assembled into a road train.