Midcoast Rail Service RB-2 is seen arriving in Brunswick. On this day the crew has both engines and 11 loaded hoppers from the Dragon Cement plant in Thomaston. With the plant slated to close at t... (more)
Midcoast Rail Service RB-2 is seen crossing over Casco Bay from West Bath into Brunswick. On this day the crew has both engines and 11 loaded hoppers from the Dragon Cement plant in Thomaston. Wit... (more)
Midcoast Rail Service RB-2 is seen crossing the Kennebec River in Bath. The remains of the old Route 1 bridge can be seen directly above the rails. The modern replacement bridge can be seen to the... (more)
Midcoast Rail Service RB-2 is seen crossing Nequasset Brook in Woolwich. On this day the crew has both engines and 11 loaded hoppers from the Dragon Cement plant in Thomaston. With the plant slate... (more)
Midcoast Rail Service RB-2 is seen crossing the 1916-built 995-foot Wiscasset Bridge spanning over the Sheepscot River. The train will continue over the long causeway and across another bridge bef... (more)
Midcoast Rail Service RB-2 is seen crossing over Salt Bay at Damariscotta Mills. On this day the crew has both engines and 11 loaded hoppers from the Dragon Cement plant in Thomaston. With the pla... (more)
Northbound RB-2 had just pulled around the loop leaving Southern's Gest St Yard. Shortly it will be on the Riverfront Running Track passing between downton and the River.
RB-2 has arrived in Cincinnati and exchanges paperwork with the Southern Yardclerk on Mehring way. Shortly the train will be at its destination, the Southern's Gest St. Yard.