A brief window of calm between snow showers and raindrops gave me a chance to capture today’s Punxsy to Butler train crossing the impressive Goodville Trestle originally built in 1899 by the Pen... (more)
Climbing out of the Allegheny River Valley, the SD60I’s are working hard as they cross the Limestone Creek trestle on their way to Butler.
On a beautiful Veterans Day eve afternoon, 3384 along with 3385 and 3386 in numerical order, soars over the Allegheny River at 10MPH on its way to Butler.
The Punxsutawney to Butler manifest is rounding the curve before crossing over Goodville Road with a quintette of EMD power.
Buffalo and Pittsburgh's RIBT makes its way south to Butler with all orange engines today. The train is seen passing the rundown Dayton Station.
Eight units travel in style along Mahoning Creek near Loop, PA, as the Buffalo & Pittsburgh RIBT (Riker-Butler) rushes along a cliff of frozen waterfalls, and crowned by a conifer.